Villa in Kyrenia
3 bed semi-detached villas + off plan + central heating + air conditioning + sea side location
BEDROOMS
3
INTERNAL SIZE
240 M2
BATHROOMS
2
LOCATION
Catalkoy
This is an off-plan project located in Catalkoy only a short walking distance to the sea and 2 popular beaches. There will be 10 villas on the site in total, with 3 types to choose from: 4 villas of 3 bedroom detached Type B, 2 villas of 3 bedroom semi-detached type C & 4 villas of 4 bedrooms type A. These are Type C, 3 bedroom semi-detached villas that will have a modern design and will include kitchen, central heating, air conditioning and fireplace. They are attached by the garage only. Luxury will be your living style. The completion date of the project is September 2019. Payment plans are available. Type-C (2 Units) 240m2 Area Exchange title deeds Completion September 2019 Attached garages 3 bedrooms all to the first floor 1 en-suite first floor 1 bathroom first floor 1 W/C ground floor Central heating system Air conditioning system Fireplace with glass cover Fitted kitchen Natural marbles, Ceramics, Parquets flooring Double glazed heat insulated aluminium doors and windows Timbered wardrobes Flat cabin shower with thin glass cover Washbasin cabinets Wall hung WC pan Steel exterior entrance door Timbered interior press door Glass railings on balconies Decorative gypsum board suspended ceilings Heat insulation Water insulation Exterior aluminium composites with timbered figure Outdoor ceramic on the terrace with timbered figure Payment Plan 1: Minimum 25% down payment on the agreed sale price, then we sign the contract of sale, Remaining 75% payment as equal monthly instalments or as interim instalments until the completion date of the project (December 2019). Payment Plan 2: Minimum 25% down payment on the agreed sale price, then we sign the contract of sale, 35% more payment as equal monthly instalments or as interim instalments until the completion date of the project (December 2019). Hereby 60% payment amount will be completed. Remaining 40% payment on the completion date of the project (December 2019) as cash. Note: These alternative payment plans are our company's preferred methods and principle. However we can slightly be flexible on these plans for this project if the client suggests alternatives regarding the payments, so these suggestions are evaluated and could be accepted too before preparing and signing the contract of sale.